T.D. Williamson (TDW), the global solutions provider, completed its first SmartPlug® isolation in offshore Nigeria, working for a major operator through its local partner, Strides Energy & Maritime Ltd. (Strides). Isolating the 267-km (165-mi) natural gas pipeline enabled the safe change-out and leak testing of platform valves without depressurizing the system.
In a long-standing partnership with Bayernwerk Netz GmbH, MAX STREICHER GmbH & Co. KG aA is building a ring line in the town of Plattling (around 130 km east of Munich) to strengthen the regional power network.
T.D. Williamson (TDW), the global pipeline solutions provider, has enhanced their Multiple Dataset (MDS) gouge versus metal loss (GvML) classifier, resulting in the industry’s first published performance specification for gouge identification and depth sizing within a dent.
Global pipeline solutions provider T.D. Williamson (TDW), recently announced that Director of Integrity Solutions Mike Kirkwood, Ph.D., has been named president of the board of directors of the Pigging Products and Services Association (PPSA).
Creaform, the worldwide leader in automated and portable 3D measurement solutions and engineering services, announced today the release of Pipecheck 6.1 software, a significant upgrade to its pipeline integrity assessment software.