Construction Commences on Trans Adriatic Pipeline
Construction has begun on the 48 inch diameter Trans Adriatic Pipeline (TAP) which will deliver 10 bcm/annum of new Caspian gas supplies to Europe from 2020.
The TAP, which constitutes the European leg of the Southern Gas Corridor, will ensure Europe’s energy supply as well as diversifying its energy sources.